Recertification Project  

29 NE 29 St, Miami

BUILT

1940

FLOORS

1

AREA

9,012 SF

COMPLETED

2025

BUILDING

INDUSTRIAL

Project overview

Structural recertification and milestone inspection of an existing reinforced concrete industrial building with a double tee precast roof system. Work included evaluation of precast roof members, concrete framing, and column connections, along with the identification of deterioration and structural deficiencies. Repair drawings were prepared and submitted in compliance with Miami-Dade County building code.