top of page

ASTON MARTIN MARINA CAMARA POLE

MIAMI, FLORIDA

BUILT: 2025

SIZE: NA

CONTRACTOR: Pablo Multitronik LLC

  • Preparation of a structural site plan identifying the locations of all proposed camera poles.

  • Development of a layout indicating approximate pole spacing and coverage areas.

  • Coordination of pole locations with existing site features, utilities, vehicular circulation, and pedestrian pathways.

RICMARA

  • Instagram
  • LinkedIn
  • X

© 2026 by Ricmara Consulting Engineers. 

bottom of page